Sourcing Events

 Sourcing Event Title

Brief Scope of Work

Expression of Interest (EOI) Issue Month

Pre-Qualification (PQQ) Issue Month

Request for Proposal (RFP) Issue Month

Low Value Materials and Services  Low Value Materials and Services (LVMS)

Further details can be found on the
News Page.

Deadline for receipt of contact details: 12:00pm (noon) Oman time on 16th April 2014
 April  2014   TBD   TBD
Development of a Reliability Based Asset Management Programme Development of a Reliability Based Asset Management Programme

Further details can be found on the
News Page.

Deadline for receipt of contact details: 12:00pm UK time on 17 February 2014
 February 2014  TBD  TBD
Consolidated Accommodation Camp - Camp Mangement Consolidated Accommodation Camp - Camp Management Contract

Further details can be found on the
News Page
.

Deadline for receipt of contact details: 12:00pm UK time on 07 February 2014.

 February 2014  TBD  TBD
 IT Integration IT Integration

Further details can be found on the News Page.

Deadline for receipt of contact details: 17:00pm UK time on 14 January 2014.
 

January 2014

 

TBD

 

TBD

 

Medical Services (Construction Phase)

Medical Services (Construction Phase)

Further details can be found on the News Page.

Deadline for receipt of contact details: 17:00pm UK time on 02 January 2014.

 

January 2014

 

TBD

 

TBD

 

Firefighting and Emergency Response Services

Firefighting and Emergency Response Services

Further details can be found on the News Page.

Deadline for receipt of contact details: 17:00pm UK time on 02 January 2014.
 

January 2014

 

TBD

 

TBD

Independent Verfication Body (IVB)


Independent Verfication Body (IVB)


Further details can be found on the News Page
.

Deadline for receipt of contact details: 12:00pm (midday) UK time on 27 September 2013.

September 2013

TBD

 TBD

Commissioning Services

Mechanical, Piping, Electrical, HVAC, Control and Instrumentation Commissioning Services.

Further details can be found on the News Page.

Deadline for receipt of contact details: 12:00pm (midday) UK time on  23 August 2013

 August 2013

 TBD

 TBD

 Isolation Joints


Manufacture of  22cr and Carbon Steel Monolithic Isolation Joints.

Further details can be found on the
News Page.

Deadline for receipt of contact details: 12:00pm (midday) UK time on  19 August 2013

 August
2013

September 2013

October
2013

 Coach Transportation

Quality coach transport services to move BP staff and contractor personnel from Muscat and other areas in Oman to Block 61 and return.
Further details can be found on the
News Page
.
Deadline for receipt of contact details: 12:00pm (midday) UK time on 27 March 2013.

 April 2013

May 2013

TBD

 22cr Duplex  Induction Bends

 

22cr duplex induction bends for 300km Gas Gathering System in Oman Block 61. 
Further details can be found on the News Page
Deadline for receipt of contact details: 9.00am UK time 12th August 2013

 August
 2013

 September
2013

 TBD

 Permanent Water Treatment Facilities

Detailed design, supply, construction, commissioning and subsequent operations and maintenance of the water treatment package and RO water distribution facility at CPF.
Further details can be found on the
News page.
Deadline for receipt of contact details: 12:00pm (midday) UK time on 9th April 2013.

 April / May 2013

April / May 2013 

TBD

 Supply and Delivery of Potable Water

Collection and delivery of potable water in support of the early stages of construction of the Oman Khazzan Project.
Further details can be found on the News page.
Deadline for receipt of contact details: 12:00pm (midday) UK time on 22nd April 2013.

 April 2013

May 2013

TBD

Waste Management Services


Receiving, handling, treatment, storage and disposal for any hazardous and non hazardous liquid and solid waste associated to the development of the Khazzan project.
Further details can be found on the
News Page.
Deadline for receipt of contact details: 12:00pm (midday) UK time on 13th June 2013.

 end June 2013

July 2013

September 2013

Drilling Mats

 

Drill rig mats to provide:
  • Providing enhanced structural support to the drilling rig sub structure and other heavy auxiliary equipment located on the well site
  • A secondary spillage containment for the the rigs fluid handling systemProviding enhanced structural support to the drilling rig sub structure and other heavy auxiliary equipment located on the well site

Further details can be found on the News Page.
Deadline for receipt of contact details: 12:00pm (midday) UK time on 18th June 2013.

mid June 2013

July 2013

 TBD

Gas Export Pipeline

The construction of a 36” NPS carbon steel pipeline, which will transport gas from BP’s Block 61 to the Omani gas network at Saih Nihayda.  The pipeline is 60km in length, will be buried, and will include a single tie-in and metering facility.  The pipeline route will include some very hard rock sections near Saih Nihayda.   It should be noted that the detailed engineering, material procurement, and commissioning will be carried out by BP.
Further details can be found on the News page.
Deadline for receipt of contact details: 12:00pm (midday) UK time on 11th July 2013.

 TBD

TBD

TBD

Condensate Export Pipeline

The construction of a 12" NPS carbon steel pipeline, which will transport the stabilised condensate from BP's Block 61 to the PDO pipeline network at Yibal. The pipeline is 68km in length, will be buried, and will include a single tie-in with metering facilities. It should be noted that the detailed engineering, material procurement, and commissioning will be carried out by BP.
Further details can be found on the News page.
Deadline for receipt of contact details: 12:00pm (midday) UK time on 12th July 2013.

 TBD

TBD

TBD

Gas Gathering Pipeline

The construction of a large, dispersed, buried gathering pipeline system that will transport multiphase gas-condensate from the well sites to the proposed Khazzan Central Processing Facility.  The gathering system will be constructed of 22%Cr Duplex Stainless Steel Line Pipe with fibre optic and power distribution cables laid along the pipeline route.  In its entirety, the Gathering System will encompass over 400km of pipelines, installed throughout the life of the Khazzan Project in support of drilling operations. This scope of work includes construction of the first 210km of the pipeline network.  The Pipeline diameters are 6” thru 24”, and the Wall Thickness will be 7mm through 18.5mm.  It should be noted that the detailed engineering, material procurement, and commissioning will be carried out by BP.
Further details can be found on the News page.
Deadline for receipt of contact details: 12:00pm (midday) UK time on 13th July 2013.

 TBD

TBD

TBD

RO Reject & Produced Water Disposal Pipelines

The construction of 2 separate, buried, water disposal pipelines that will transport produced water and reverse osmosis reject water from the proposed Khazzan Central Processing Facility to water disposal wells along the southern edge of Block 61.  The 10” NPS produced water injection pipeline will be 22km in length.  The X-65 carbon steel pipeline has a wall thickness of 11.8 mm, with an additional 3mm tight-fit polyethylene liner.  The 8” NPS reverse osmosis reject water injection pipeline will be 18km in length.  The X-65 carbon steel pipeline has a wall thickness of 9.5mm, with an additional 3mm tight-fit polyethylene liner.  It should be noted that the detailed engineering, material procurement, and commissioning will be carried out by BP. 
Further details can be found on the News page.
Deadline for receipt of contact details: 12:00pm (midday) UK time on 14th July 2013.

 TBD

TBD

TBD

Wellsite Facilities

The procurement, fabrication, and installation of Gas Production and Water Disposal Well Site Facilities.  Approximately 58 individual well sites will be constructed through the 2015 – 2017 time period.  The Well Site facilities include all equipment and utilities required to deliver well fluids from the wellhead to the Gathering System including piping, valving, instrumentation, metering, hydraulic control panels, telecoms, and power distribution.  Equipment on the Well Sites will be skid-based and of standard modular design.  The main production line is 6” NPS, constructed of 25Cr Super Duplex Stainless Steel and 22Cr Duplex Stainless Steel.  The skids are to be fabricated and tested off-site to minimise site construction and optimise hook-up and commissioning efficiency.  It should be noted that the detailed engineering and commissioning will be carried out by BP.
Further details can be found on the News page.
Deadline for receipt of contact details: 12:00pm (midday) UK time on 15th July 2013.

TBD 

TBD

TBD

 Tight Gas Wellhead Skid Module

 BP is seeking expressions of interest from suitably qualified and experienced companies in the fabrication of production well head skid modules. The requirement is to fabricate, test and deliver skid modules to the job site.

Further details can be found on the
News page.

Deadline for receipt of contact details: 12:00pm (midday) UK time on 4th April 2014
     

If you are interested in receiving an EOI for any of the above scopes and the deadlines indicated have not passed, please send the following details to khazzanpscm@uk.bp.com. Messages must include the Sourcing Event Title in the header.
  • Company Name
  • Country
  • Contact Number
  • Contact Name
  • Job Title
  • Mobile / Cell Number
  • Email
  • HQ Address.

Disclaimer: Descriptions should be used for guidance only, and BP reserves the right to change this information or withdraw it completely at any time. Any responses received after the due date stated shall not be considered.